Documents for Download
Route 4 Corridor Plan - Public Review Draft
Appendix A: Existing Conditions Study
Town Land Use - Transportation Concepts Map
Village Center - Transportation Concepts Map
In order order to view the above documents, you need to have Adobe Acrobat installed on your computer. To get a free copy of Acrobat Reader®, click here.
Committee Members:
- Jaime O’Neill (Saratoga County Planning Department)
- Kathie Stoddard (Town of Stillwater)
- Greg Connors (Supervisor, Town of Stillwater)
- Ernest Martin (Village of Stillwater)
- Annetta Melber (representative from the Village of Stillwater)
- Joe Finan (from the Saratoga National Historical Park)
- Jason Purvis (CDTC)
- Shelley Lang (CDTC)
- Kevin Novak (NYSDOT Region 1)
- Kate Maynard (Saratoga PLAN)
- Michael Welti (The Chazen Companies)
- Project Manager:
Michael Welti, The Chazen Companies
Brief Description:
The Study Area for the Route 4 Corridor Plan includes Route 4 and lands within approximately one-half mile of the roadway in the Town and Village of Stillwater. The purpose of this information page will be to:
- Introduce this corridor planning project to the public
- Provide a summary of existing conditions in the corridor
- expand upon the Study Advisory Committee’s understanding of the issues of concern that should be addressed through this study
- To engage residents and promote feedback in a way that will help guide the development of design guidelines for the corridor
Meeting & Workshop Minutes:
November 15th, 2005 - Meeting 1: Project Initiation
January 18th, 2006 - Meeting 2
January 26th, 2006 - PUBLIC WORKSHOP 1
February 1st, 2006 - Meeting 3
April 5th, 2006 - Meeting 4
May 23rd, 2006 - PUBLIC WORKSHOP 2
June 1st, 2006 - Meeting 5
Contact:
For more information regarding this project you can contact the following persons:
Shawn P. Connelly, Stillwater Town Supervisor
518-664-6148 – Ext. 201/202
Michael A. Welti, AICP
Senior Planner
The Chazen Companies
547 River Street, Troy, New York 12180
Phone: 518-273-0055
Fax: 518-273-8391
|